This button opens the screen with rules for cards at the work location. These rules deactivate cards automatically, for example after a number of days or when a certificate expires.
Why use it?
You do not want cards to stay active indefinitely. With these rules, cards stop automatically when they are no longer needed or when someone is no longer allowed to enter the construction site.
Applies to
Project level
You find this button in the project settings, on the Access tab, under the Other settings.
How does it work?
Go to the project settings and open the Access tab
Under Other settings, select Adjust rules for cards
-
You see a list of rules. Examples include:
always deactivate a card after a number of days
deactivate a card if it has not been used for a number of days
deactivate a card when the VCA diploma, the A1 certificate or the TWV (Dutch work permit) expires
Select Active for the rules you want to use. For rules with a time limit, enter the number of days.
Save your changes
The rules you switch on count towards the Access score of the project.